Dormant storylines
Threads the desk still tracks but has not confirmed in 45+ days. They stay here as receipts, ranked oldest-quiet first. A new story on any of these reopens its arc and flips it back to active automatically.
Active storylines → Radar
23 dormant threads Consolidation of the estimating stack (TM+/Vigilince, Verisk/AccuLynx and the FTC review of who controls pricing integrations) Dormant
Wildfire smoke damage standards and contractor certification (CA AB 1795, CalEPA standards due June 30 2027, certification Jan 1 2028) Dormant
Catastrophe / wildfire demand drivers (NorCal dry-lightning fire weather, CAT-season readiness) Dormant
Coverage-law rulings reshaping mitigation/notice/RCV (Global Approach late-notice, Kimmel RCV trap, cyber/wire-fraud sublimits) Dormant
Restoration software product launches and rebrands (what vendors are shipping) Dormant
AI in claims, from scoping tool to decision-maker (NAIC bulletin in 25+ states, CA SB1120, "meaningful vs theater" review) Dormant
OSHA heat / EPA RRP regulatory load on contractors Dormant
Carrier exits / FAIR plan stress (now inverting to carrier re-entry in FL/CO) Dormant
Industry federal recognition / advocacy (RIA NAICS code 624231 for Emergency Restoration Services; IICRC supporting comments; 2027 review) Dormant
PE consolidation vs. the independent operator Dormant
Carrier claims suppression (anti-PA endorsements, O&P denial, fraud-vs-undervaluation, named-carrier wildfire slow-pay) Dormant
Mold health-science evidence base (NIH $3M CFS study; CDC invasive-mold-disease data, positive test != diagnosis) Dormant
Operator economics: scale, getting paid, benchmarking Dormant
IICRC standards revisions (S700 wildfire, S520 mold) Dormant
Smart-water / leak-detection mandates shrinking mitigation volume (now Farmers renewal-gate, State Farm CA, commercial coverage gated) + industry prevention pivot Dormant
State mold-remediation licensing/certification mandates (CT S520, Oct 1) Dormant
Construction labor shortage + immigration enforcement Dormant
Xactimate labor-efficiency tiers ("New Construction" relabeled "Total Rebuild or Similar"; 2026+ price list required) Dormant
Permitting / general regulatory shifts affecting restoration jobs Dormant
NFIP reauthorization cliff (Sept 30, 2026) + flood protection gap Dormant
TPA vs no-TPA strategy (growth vs margin/control) Dormant
Tariff-driven equipment / materials cost pressure Dormant
Overhead & profit denial / three-trades fight Dormant